755 | -- | 772 | Fangfang Zhang, Wei Wang. Decentralized control of discrete-Time system with delay in mean field LQR problem |
773 | -- | 787 | Jiangbo Zhang, Ge Chen. Convergence rate of the asymmetric Deffuant-Weisbuch dynamics |
788 | -- | 798 | Ruili Wen, Shugen Chai. Regularity for Euler-Bernoulli equations with boundary control and collocated observation |
799 | -- | 812 | Chen Qiao, Dong Liang, Ke-Feng Sun. Dynamics analysis for generic projection continuous-time RNNs with bounded matrices |
813 | -- | 829 | Zhiguo Yan, Guoshan Zhang, Jiankui Wang, Weihai Zhang. State and output feedback finite-time guaranteed cost control of linear itô stochastic systems |
830 | -- | 847 | Cheng Tan, Weihai Zhang. On observability and detectability of continuous-time stochastic Markov jump systems |
848 | -- | 856 | Jiankui Yang, Yuehua Hu. Stability of Kumar-Seidman networks under longest queue first policy |
857 | -- | 875 | B. B. Upadhyay, S. K. Mishra. Nonsmooth semi-infinite minmax programming involving generalized (Φ, ρ)-invexity |
876 | -- | 886 | Yaohua Tang, Wenguo Yang, Tiande Guo. Definition and algorithms for reliable steiner tree problem |
887 | -- | 906 | Junsong Bian, Kin Keung Lai, Zhongsheng Hua. Manufacturers' channel competition with retailer demand-enhancing service |
907 | -- | 924 | Xuemei Jiang, Yifang Liu, Jin Zhang, Lei Zu, Shouyang Wang, Christopher Green. 2 emissions |
925 | -- | 937 | Wuqing Wu, Xiaojing Wang. A Novel approach to construct a composite indicator by maximizing its sum of squared correlations with Sub-indicators |
938 | -- | 960 | Wei Xia, Zhao Chen, Wuqing Wu, Jianjun Zhou. Local polynomial-brunk estimation in semi-parametric monotone errors-in-variables model with right-censored data |
961 | -- | 977 | Weihua Zhao, Riquan Zhang. t regression models |
978 | -- | 996 | Yan Xu, Benhai Yu, Youtian Wang, Yanliang Chen. A stochastic evolutionary game perspective on the stability of strategic alliances against external opportunism |
997 | -- | 1014 | Hui Zhao, Ximin Rong. Optimal investment with multiple risky assets for an insurer with modified periodic risk process |