Ultrashort-Term Scheduling of Interbasin Cascaded Hydropower Plants to Rapidly Balance the Load Demand

Xiong Cheng, Ying-Ling Tang, Ji Liu, Hao Zhong, Wen-Wu Li, Ya-Liang Wu. Ultrashort-Term Scheduling of Interbasin Cascaded Hydropower Plants to Rapidly Balance the Load Demand. IEEE Access, 8:32737-32756, 2020. [doi]

Abstract

Abstract is missing.