The project scheduling problem with irregular starting time costs

Vittorio Maniezzo, Aristide Mingozzi. The project scheduling problem with irregular starting time costs. Oper. Res. Lett., 25(4):175-182, 1999. [doi]

Abstract

Abstract is missing.