Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem

Vahid Nasrollahi, Ghasem Moslehi, Mohammad Reisi-Nafchi. Minimizing the weighted sum of maximum earliness and maximum tardiness in a single-agent and two-agent form of a two-machine flow shop scheduling problem. Operational Research, 22(2):1403-1442, 2022. [doi]

Abstract

Abstract is missing.