A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry

Lixin Tang, Xianpeng Wang. A Two-Phase Heuristic for the Production Scheduling of Heavy Plates in Steel Industry. IEEE Trans. Contr. Sys. Techn., 18(1):104-117, 2010. [doi]

Abstract

Abstract is missing.