The following publications are possibly variants of this publication:
- The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobsRubing Chen, Jinjiang Yuan, Yuan Gao. scheduling, 22(5):581-593, 2019. [doi]
- On scheduling with non-increasing time slot cost to minimize total weighted completion timeYingchao Zhao, Xiangtong Qi, Minming Li. scheduling, 19(6):759-767, 2016. [doi]
- A note on the preemptive scheduling to minimize total completion time with release time and deadline constraintsLong Wan, Jinjiang Yuan, Zhichao Geng. scheduling, 18(3):315-323, 2015. [doi]