Investigation of the Dynamic Behaviour of a High Pressure Hydro Power Plant in the Swiss Alps during the Transition from Interconneted to Isolated Operation

Harald W. Weber. Investigation of the Dynamic Behaviour of a High Pressure Hydro Power Plant in the Swiss Alps during the Transition from Interconneted to Isolated Operation. In Felix Breitenecker, Irmgard Husinsky, editors, EUROSIM 96, Simulation Congress, Proceedings of the 1995 EUROSIM Conference, Vienna, Austria, 11-15 September 1995. pages 759-764, Elsevier, 1995.

Abstract

Abstract is missing.