Methods to estimate the lead time of an order in a flexible flowshop

Wei Weng 0001, Shigeru Fujimura 0001. Methods to estimate the lead time of an order in a flexible flowshop. In IEEE International Conference on Industrial Technology, ICIT 2016, Taipei, Taiwan, March 14-17, 2016. pages 1353-1356, IEEE, 2016. [doi]

Abstract

Abstract is missing.