Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties

Yunqiang Yin, Shuenn-Ren Cheng, Chin-Chia Wu. Scheduling problems with two agents and a linear non-increasing deterioration to minimize earliness penalties. Inf. Sci., 189:282-292, 2012. [doi]

Abstract

Abstract is missing.