Error correction-based forecasting of reservoir water levels: Improving accuracy over multiple lead times

Xiaojing Zhang, Pan Liu, Yan Zhao, Chao Deng, Zejun Li, Mengsi Xiong. Error correction-based forecasting of reservoir water levels: Improving accuracy over multiple lead times. Environmental Modelling and Software, 104:27-39, 2018. [doi]

Abstract

Abstract is missing.