Karam Allali, Said Aqil, Jabrane Belabid. Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness. Simulation Modelling Practice and Theory, 116:102455, 2022. [doi]
@article{AllaliAB22, title = {Distributed no-wait flow shop problem with sequence dependent setup time: Optimization of makespan and maximum tardiness}, author = {Karam Allali and Said Aqil and Jabrane Belabid}, year = {2022}, doi = {10.1016/j.simpat.2021.102455}, url = {https://doi.org/10.1016/j.simpat.2021.102455}, researchr = {https://researchr.org/publication/AllaliAB22}, cites = {0}, citedby = {0}, journal = {Simulation Modelling Practice and Theory}, volume = {116}, pages = {102455}, }