Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption

Sadiqi Assia, Ikram El Abbassi, Abdellah Elbarkany, Moumen Darcherif, Ahmed El Biyaali. Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption. Adv. Operations Research, 2020, 2020. [doi]

@article{AssiaAEDB20,
  title = {Green Scheduling of Jobs and Flexible Periods of Maintenance in a Two-Machine Flowshop to Minimize Makespan, a Measure of Service Level and Total Energy Consumption},
  author = {Sadiqi Assia and Ikram El Abbassi and Abdellah Elbarkany and Moumen Darcherif and Ahmed El Biyaali},
  year = {2020},
  doi = {10.1155/2020/9732563},
  url = {https://doi.org/10.1155/2020/9732563},
  researchr = {https://researchr.org/publication/AssiaAEDB20},
  cites = {0},
  citedby = {0},
  journal = {Adv. Operations Research},
  volume = {2020},
}