The following publications are possibly variants of this publication:
- Single machine batch scheduling problem with family setup times and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. scheduling, 9(6):499-513, 2006. [doi]
- Iterated Local Search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardinessHongyun Xu, Zhipeng Lü, T. C. E. Cheng. scheduling, 17(3):271-287, 2014. [doi]
- The Single Machine Batching Problem with Family Setup Times to Minimize Maximum Lateness is Strongly NP-HardT. C. Edwin Cheng, C. T. Ng, J. J. Yuan. scheduling, 6(5):483-490, 2003.
- Single machine group scheduling with resource dependent setup and processing timesAdam Janiak, Mikhail Y. Kovalyov, Marie-Claude Portmann. eor, 162(1):112-121, 2005. [doi]
- Single machine batch scheduling with deadlines and resource dependent processing timesT. C. Edwin Cheng, Mikhail Y. Kovalyov. orl, 17(5):243-249, 1995. [doi]