The following publications are possibly variants of this publication:
- Single machine batch scheduling problem with family setup times and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. scheduling, 9(6):499-513, 2006. [doi]
- Iterated Local Search for single-machine scheduling with sequence-dependent setup times to minimize total weighted tardinessHongyun Xu, Zhipeng Lü, T. C. E. Cheng. scheduling, 17(3):271-287, 2014. [doi]
- The Single Machine Batching Problem with Family Setup Times to Minimize Maximum Lateness is Strongly NP-HardT. C. Edwin Cheng, C. T. Ng, J. J. Yuan. scheduling, 6(5):483-490, 2003.
- An approximation scheme for two-machine flowshop scheduling with setup times and an availability constraintXiuli Wang, T. C. Edwin Cheng. cor, 34(10):2894-2901, 2007. [doi]
- Heuristics for two-machine flowshop scheduling with setup times and an availability constraintXiuli Wang, T. C. Edwin Cheng. cor, 34(1):152-162, 2007. [doi]
- Two-stage hybrid flowshop scheduling with simultaneous processing machinesBailin Wang, Kai Huang 0003, Tieke Li. scheduling, 21(4):387-411, 2018. [doi]