The following publications are possibly variants of this publication:
- Two-machine flowshop scheduling with three-operation jobs subject to a fixed job sequenceBertrand M. T. Lin, F. J. Hwang, Jatinder N. D. Gupta. scheduling, 20(3):293-302, 2017. [doi]
- Two-agent flowshop scheduling to maximize the weighted number of just-in-time jobsYunqiang Yin, T. C. E. Cheng, Dujuan Wang, Chin-Chia Wu. scheduling, 20(4):313-335, 2017. [doi]
- Quantity-based buffer-constrained two-machine flowshop problem: active and passive prefetch models for multimedia applicationsAlexander Kononov, Jen-Shin Hong, Polina Kononova, Feng-Cheng Lin. scheduling, 15(4):487-497, 2012. [doi]