The following publications are possibly variants of this publication:
- Selecting project-critical path by a new interval type-2 fuzzy decision methodology based on MULTIMOORA, MOOSRA and TPOP methodsY. Dorfeshan, S. Meysam Mousavi, Vahid Mohagheghi, Behnam Vahdani. candie, 120:160-178, 2018. [doi]
- A New Enhanced ARAS Method for Critical Path Selection of Engineering Projects with Interval Type-2 Fuzzy SetsYahya Dorfeshan, Seyed Meysam Mousavi, Edmundas Kazimieras Zavadskas, Jurgita Antucheviciene. ijitdm, 20(1):37-65, 2021. [doi]
- A novel interval type-2 fuzzy decision model based on two new versions of relative preference relation-based MABAC and WASPAS methods (with an application in aircraft maintenance planning)Y. Dorfeshan, S. Meysam Mousavi. nca, 32(8):3367-3385, 2020. [doi]