Preemptive scheduling in a two-stage multiprocessor flowshop with resource constraints

Ewa Figielska. Preemptive scheduling in a two-stage multiprocessor flowshop with resource constraints. In Juan Andrade-Cetto, Jean-Louis Ferrier, José Dias Pereira, Joaquim Filipe, editors, ICINCO 2006, Proceedings of the Third International Conference on Informatics in Control, Automation and Robotics, Intelligent Control Systems and Optimization, Setúbal, Portugal, August 1-5, 2006. pages 130-135, INSTICC Press, 2006.

@inproceedings{Figielska06,
  title = {Preemptive scheduling in a two-stage multiprocessor flowshop with resource constraints},
  author = {Ewa Figielska},
  year = {2006},
  tags = {constraints},
  researchr = {https://researchr.org/publication/Figielska06},
  cites = {0},
  citedby = {0},
  pages = {130-135},
  booktitle = {ICINCO 2006, Proceedings of the Third International Conference on Informatics in Control, Automation and Robotics, Intelligent Control Systems and Optimization, Setúbal, Portugal, August 1-5, 2006},
  editor = {Juan Andrade-Cetto and Jean-Louis Ferrier and José Dias Pereira and Joaquim Filipe},
  publisher = {INSTICC Press},
  isbn = {972-8865-59-7},
}