Scheduling a two-stage hybrid flow shop with parallel machines at the first stage

Jatinder N. D. Gupta, A. M. A. Hariri, Chris N. Potts. Scheduling a two-stage hybrid flow shop with parallel machines at the first stage. Annals OR, 69:171-191, 1997. [doi]

Authors

Jatinder N. D. Gupta

This author has not been identified. Look up 'Jatinder N. D. Gupta' in Google

A. M. A. Hariri

This author has not been identified. Look up 'A. M. A. Hariri' in Google

Chris N. Potts

This author has not been identified. Look up 'Chris N. Potts' in Google