The following publications are possibly variants of this publication:
- Minimizing total tardiness in the permutation flowshop scheduling problem with minimal and maximal time lagsImen Hamdi, Taïcir Loukil. or, 15(1):95-114, 2015. [doi]
- Non-permutation flowshop scheduling problem with minimal and maximal time lags: theoretical study and heuristicEmna Dhouib, Jacques Teghem, Taïcir Loukil. anor, 267(1-2):101-134, 2018. [doi]
- Upper and lower bounds for the permutation flowshop scheduling problem with minimal time lagsImen Hamdi, Taïcir Loukil. ol, 9(3):465-482, 2015. [doi]
- Minimizing the Number of Tardy Jobs in a Permutation Flowshop Scheduling Problem with Setup Times and Time Lags ConstraintsEmna Dhouib, Jacques Teghem, Taïcir Loukil. jmma, 12(1):85-99, 2013. [doi]