The following publications are possibly variants of this publication:
- Integrated internal truck, yard crane and quay crane scheduling in a container terminal considering energy consumptionJunliang He, Youfang Huang, Wei Yan, Shuaian Wang. eswa, 42(5):2464-2487, 2015. [doi]
- A quay crane scheduling algorithm considering the workload of yard cranes in a container yardYan Wang, Kap Hwan Kim. jim, 22(3):459-470, 2011. [doi]
- Scheduling of collaborative operations of yard cranes and yard trucks for export containers using hybrid approachesHsien-Pin Hsu, Hui-Huang Tai, Chia-Nan Wang, Chien-Chang Chou. aei, 48:101292, 2021. [doi]
- Scheduling quay cranes and yard trucks for unloading operations in container portsLu Zhen, Shucheng Yu, Shuaian Wang, Zhuo Sun. anor, 273(1-2):455-478, 2019. [doi]