The following publications are possibly variants of this publication:
- A referenced iterated greedy algorithm for the distributed assembly mixed no-idle permutation flowshop scheduling problem with the total tardiness criterionYuanzhen Li, Quan-ke Pan, Rubén Ruiz, Hongyan Sang. kbs, 239:108036, 2022. [doi]
- An effective Iterated Greedy algorithm for the distributed permutation flowshop scheduling with due windowsXue-Lei Jing, Quan-ke Pan, Liang Gao 0001, Yu-Long Wang. asc, 96:106629, 2020. [doi]
- An effective multi-start iterated greedy algorithm to minimize makespan for the distributed permutation flowshop scheduling problem with preventive maintenanceJia-Yang Mao, Quan-ke Pan, Zhong-hua Miao, Liang Gao 0001. eswa, 169:114495, 2021. [doi]
- An Adaptive Iterated Greedy algorithm for distributed mixed no-idle permutation flowshop scheduling problemsYuanzhen Li, Quan-ke Pan, Jun-qing Li, Liang Gao 0001, Mehmet Fatih Tasgetiren. swevo, 63:100874, 2021. [doi]
- A cooperative population-based iterated greedy algorithm for distributed permutation flowshop group scheduling problemHui Zhao, Quan-ke Pan, Kai-Zhou Gao. eaai, 125:106750, 2023. [doi]