Optimal work breaks in deterministic and probabilistic repetitive projects

Photios G. Ioannou, Chachrist Srisuwanrat. Optimal work breaks in deterministic and probabilistic repetitive projects. In Shane G. Henderson, Bahar Biller, Ming-Hua Hsieh, John Shortle, Jeffrey D. Tew, Russell R. Barton, editors, Proceedings of the Winter Simulation Conference, WSC 2007, Washington, DC, USA, December 9-12, 2007. pages 2141-2150, WSC, 2007. [doi]

Authors

Photios G. Ioannou

This author has not been identified. Look up 'Photios G. Ioannou' in Google

Chachrist Srisuwanrat

This author has not been identified. Look up 'Chachrist Srisuwanrat' in Google