The following publications are possibly variants of this publication:
- Decentralized deadline-aware coflow scheduling for datacenter networksShouxi Luo, Hong-Fang Yu, Lemin Li. icc 2016: 1-6 [doi]
- Adia: Achieving High Link Utilization with Coflow-Aware Scheduling in Data Center NetworksJingjie Jiang, Shiyao Ma, Bo Li 0001, Baochun Li. tcc, 7(2):431-441, 2019. [doi]
- Scheduling Mix-Coflows in Datacenter NetworksRenhai Xu, Wenxin Li 0001, Keqiu Li, Xiaobo Zhou 0003, Heng Qi. tnsm, 18(2):2002-2015, 2021. [doi]
- Co-Scheduler: A Coflow-Aware Data-Parallel Job Scheduler in Hybrid Electrical/Optical Datacenter NetworksZhuozhao Li, Haiying Shen. ton, 30(4):1599-1612, 2022. [doi]