Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates

Hamiden Abd El-Wahed Khalifa, Sultan S. Alodhaibi, Pavan Kumar 0004. Solving Constrained Flow-Shop Scheduling Problem through Multistage Fuzzy Binding Approach with Fuzzy Due Dates. Adv. Fuzzy Systems, 2021, 2021. [doi]

Authors

Hamiden Abd El-Wahed Khalifa

This author has not been identified. Look up 'Hamiden Abd El-Wahed Khalifa' in Google

Sultan S. Alodhaibi

This author has not been identified. Look up 'Sultan S. Alodhaibi' in Google

Pavan Kumar 0004

This author has not been identified. Look up 'Pavan Kumar 0004' in Google