Chung-Yee Lee. Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint. Oper. Res. Lett., 20(3):129-139, 1997. [doi]
@article{Lee97-10, title = {Minimizing the makespan in the two-machine flowshop scheduling problem with an availability constraint}, author = {Chung-Yee Lee}, year = {1997}, doi = {10.1016/S0167-6377(96)00041-7}, url = {http://dx.doi.org/10.1016/S0167-6377(96)00041-7}, researchr = {https://researchr.org/publication/Lee97-10}, cites = {0}, citedby = {0}, journal = {Oper. Res. Lett.}, volume = {20}, number = {3}, pages = {129-139}, }