Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times

Joseph Y.-T. Leung, C. T. Ng, T. C. Edwin Cheng. Minimizing sum of completion times for batch scheduling of jobs with deteriorating processing times. European Journal of Operational Research, 187(3):1090-1099, 2008. [doi]

Authors

Joseph Y.-T. Leung

This author has not been identified. Look up 'Joseph Y.-T. Leung' in Google

C. T. Ng

This author has not been identified. Look up 'C. T. Ng' in Google

T. C. Edwin Cheng

This author has not been identified. Look up 'T. C. Edwin Cheng' in Google