Xin Li, Richard Y. K. Fung. Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times. J. Scheduling, 19(2):165-176, 2016. [doi]
@article{LiF16-2, title = {Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times}, author = {Xin Li and Richard Y. K. Fung}, year = {2016}, doi = {10.1007/s10951-015-0448-7}, url = {http://dx.doi.org/10.1007/s10951-015-0448-7}, researchr = {https://researchr.org/publication/LiF16-2}, cites = {0}, citedby = {0}, journal = {J. Scheduling}, volume = {19}, number = {2}, pages = {165-176}, }