Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times

Xin Li, Richard Y. K. Fung. Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times. J. Scheduling, 19(2):165-176, 2016. [doi]

@article{LiF16-2,
  title = {Optimal K-unit cycle scheduling of two-cluster tools with residency constraints and general robot moving times},
  author = {Xin Li and Richard Y. K. Fung},
  year = {2016},
  doi = {10.1007/s10951-015-0448-7},
  url = {http://dx.doi.org/10.1007/s10951-015-0448-7},
  researchr = {https://researchr.org/publication/LiF16-2},
  cites = {0},
  citedby = {0},
  journal = {J. Scheduling},
  volume = {19},
  number = {2},
  pages = {165-176},
}