The following publications are possibly variants of this publication:
- Enhanced migrating birds optimization algorithm for U-shaped assembly line balancing problems with workers assignmentZikai Zhang, Qiuhua Tang, Dayong Han, Zixiang Li. nca, 31(11):7501-7515, 2019. [doi]
- Multi-objective migrating bird optimization algorithm for cost-oriented assembly line balancing problem with collaborative robotsZixiang Li, Mukund Nilakantan Janardhanan, Qiuhua Tang. nca, 33(14):8575-8596, 2021. [doi]
- Model and migrating birds optimization algorithm for two-sided assembly line worker assignment and balancing problemMukund Nilakantan Janardhanan, Zixiang Li, Peter Nielsen. soco, 23(21):11263-11276, 2019. [doi]
- Models and algorithms for U-shaped assembly line balancing problem with collaborative robotsZixiang Li, Mukund Nilakantan Janardhanan, Qiuhua Tang, Zikai Zhang. soco, 27(14):9639-9659, July 2023. [doi]
- Modelling and optimisation of energy-efficient U-shaped robotic assembly line balancing problemsZikai Zhang, Qiuhua Tang, Zixiang Li, Liping Zhang. ijpr, 57(17):5520-5537, 2019. [doi]
- Branch, bound and remember algorithm for U-shaped assembly line balancing problemZixiang Li, Ibrahim Kucukkoc, Zikai Zhang. candie, 124:24-35, 2018. [doi]