The following publications are possibly variants of this publication:
- Hybrid Heuristic for Total Flowtime Minimization in No-wait Flow ShopsXia Zhu, Xiaoping Li, Qian Wang. cscwd 2007: 1050-1054 [doi]
- Meta-heuristic for no-wait job shops with makespan minimizationJie Zhu, Xiaoping Li, Yi Zhang, Qian Wang. cscwd 2008: 874-879 [doi]
- An effective and efficient heuristic for no-wait flow shop production to minimize total completion timeHonghan Ye, Wei Li, Amin Abedini, Barrie R. Nault. candie, 108:57-69, 2017. [doi]
- An Efficient Method for No-Wait Flow Shop Scheduling to Minimize MakespanXiaoping Li, Qian Wang, Cheng Wu. cscwd 2006: 1296-1301 [doi]