The following publications are possibly variants of this publication:
- Single machine batch scheduling problem with family setup times and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. scheduling, 9(6):499-513, 2006. [doi]
- Competitive two-agent scheduling with release dates and preemption on a single machineShi-sheng Li, Ren-Xia Chen. scheduling, 26(3):227-249, June 2023. [doi]
- Large-scale energy-conscious bi-objective single-machine batch scheduling under time-of-use electricity tariffs via effective iterative heuristicsPeng Wu 0004, Junheng Cheng, Feng Chu. anor, 296(1):471-494, 2021. [doi]
- Two-agent single-machine scheduling with release dates and preemption to minimize the maximum latenessJ. J. Yuan, C. T. Ng, T. C. Edwin Cheng. scheduling, 18(2):147-153, 2015. [doi]
- Minimizing Total Completion Time Subject to Job Release Dates and Preemption PenaltiesZhaohui Liu, T. C. Edwin Cheng. scheduling, 7(4):313-327, 2004. [doi]