Optimal holding time calculation algorithm to improve the reliability of high frequency bus route considering the bus capacity constraint

Shidong Liang, Shengxue He, Hu Zhang, Minghui Ma. Optimal holding time calculation algorithm to improve the reliability of high frequency bus route considering the bus capacity constraint. Rel. Eng. & Sys. Safety, 212:107632, 2021. [doi]

@article{LiangHZM21,
  title = {Optimal holding time calculation algorithm to improve the reliability of high frequency bus route considering the bus capacity constraint},
  author = {Shidong Liang and Shengxue He and Hu Zhang and Minghui Ma},
  year = {2021},
  doi = {10.1016/j.ress.2021.107632},
  url = {https://doi.org/10.1016/j.ress.2021.107632},
  researchr = {https://researchr.org/publication/LiangHZM21},
  cites = {0},
  citedby = {0},
  journal = {Rel. Eng. & Sys. Safety},
  volume = {212},
  pages = {107632},
}