Yefeng Liu, Tianyou Chai, S. Joe Qin, Quanke Pan, Shengxiang Yang. Improved genetic algorithm for magnetic material two-stage multi-product production scheduling: A case study. In Proceedings of the 51th IEEE Conference on Decision and Control, CDC 2012, December 10-13, 2012, Maui, HI, USA. pages 2521-2526, IEEE, 2012. [doi]
@inproceedings{LiuCQPY12, title = {Improved genetic algorithm for magnetic material two-stage multi-product production scheduling: A case study}, author = {Yefeng Liu and Tianyou Chai and S. Joe Qin and Quanke Pan and Shengxiang Yang}, year = {2012}, doi = {10.1109/CDC.2012.6426459}, url = {http://dx.doi.org/10.1109/CDC.2012.6426459}, researchr = {https://researchr.org/publication/LiuCQPY12}, cites = {0}, citedby = {0}, pages = {2521-2526}, booktitle = {Proceedings of the 51th IEEE Conference on Decision and Control, CDC 2012, December 10-13, 2012, Maui, HI, USA}, publisher = {IEEE}, isbn = {978-1-4673-2065-8}, }