The following publications are possibly variants of this publication:
- Replacement problems for a cold standby repairable systemY. L. Zhang, G. J. Wang, Z. C. Ji. ijsysc, 37(1):17-25, 2006. [doi]
- A deteriorating cold standby repairable system with priority in useYuan Lin Zhang, Guan Jun Wang. eor, 183(1):278-295, 2007. [doi]
- A bivariate optimal replacement policy for a cold standby repairable system with preventive repairGuan Jun Wang, Yuan Lin Zhang. amc, 218(7):3158-3165, 2011. [doi]
- An optimal replacement policy for repairable cold standby system with priority in useGuan Jun Wang, Yuan Lin Zhang. ijsysc, 38(12):1021-1027, 2007. [doi]
- A new repair model and its optimization for cold standby systemJunyuan Wang, Jimin Ye. or, 22(1):105-122, 2022. [doi]
- A geometric process repair model for a repairable cold standby system with priority in use and repairYuan Lin Zhang, Guan Jun Wang. ress, 94(11):1782-1787, 2009. [doi]