Scheduling a realistic hybrid flow shop with stage skipping and adjustable processing time in steel plants

Jianyu Long, Zhong Zheng, Xiaoqiang Gao, Panos M. Pardalos. Scheduling a realistic hybrid flow shop with stage skipping and adjustable processing time in steel plants. Appl. Soft Comput., 64:536-549, 2018. [doi]

Authors

Jianyu Long

This author has not been identified. Look up 'Jianyu Long' in Google

Zhong Zheng

This author has not been identified. Look up 'Zhong Zheng' in Google

Xiaoqiang Gao

This author has not been identified. Look up 'Xiaoqiang Gao' in Google

Panos M. Pardalos

This author has not been identified. Look up 'Panos M. Pardalos' in Google