A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness

Xiaochuan Luo, Chengbin Chu. A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness. European Journal of Operational Research, 180(1):68-81, 2007. [doi]

@article{LuoC07,
  title = {A branch-and-bound algorithm of the single machine schedule with sequence-dependent setup times for minimizing maximum tardiness},
  author = {Xiaochuan Luo and Chengbin Chu},
  year = {2007},
  doi = {10.1016/j.ejor.2005.06.069},
  url = {http://dx.doi.org/10.1016/j.ejor.2005.06.069},
  researchr = {https://researchr.org/publication/LuoC07},
  cites = {0},
  citedby = {0},
  journal = {European Journal of Operational Research},
  volume = {180},
  number = {1},
  pages = {68-81},
}