Jianchao Luo, Zhiqiang Liu, Keyi Xing. Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times. Int. J. Prod. Res., 57(5):1398-1412, 2019. [doi]
@article{LuoLX19-0, title = {Hybrid branch and bound algorithms for the two-stage assembly scheduling problem with separated setup times}, author = {Jianchao Luo and Zhiqiang Liu and Keyi Xing}, year = {2019}, doi = {10.1080/00207543.2018.1489156}, url = {https://doi.org/10.1080/00207543.2018.1489156}, researchr = {https://researchr.org/publication/LuoLX19-0}, cites = {0}, citedby = {0}, journal = {Int. J. Prod. Res.}, volume = {57}, number = {5}, pages = {1398-1412}, }