On the polyhedral structure of a multi-item production planning model with setup times

Andrew J. Miller, George L. Nemhauser, Martin W. P. Savelsbergh. On the polyhedral structure of a multi-item production planning model with setup times. Math. Program., 94(2-3):375-405, 2003. [doi]

@article{MillerNS03a,
  title = {On the polyhedral structure of a multi-item production planning model with setup times},
  author = {Andrew J. Miller and George L. Nemhauser and Martin W. P. Savelsbergh},
  year = {2003},
  doi = {10.1007/s10107-002-0325-y},
  url = {http://dx.doi.org/10.1007/s10107-002-0325-y},
  researchr = {https://researchr.org/publication/MillerNS03a},
  cites = {0},
  citedby = {0},
  journal = {Math. Program.},
  volume = {94},
  number = {2-3},
  pages = {375-405},
}