H. Mirzahosseinian, R. Piplani. A study of repairable parts inventory system operating under performance-based contract. European Journal of Operational Research, 214(2):256-261, 2011. [doi]
@article{MirzahosseinianP11, title = {A study of repairable parts inventory system operating under performance-based contract}, author = {H. Mirzahosseinian and R. Piplani}, year = {2011}, doi = {10.1016/j.ejor.2011.04.035}, url = {http://dx.doi.org/10.1016/j.ejor.2011.04.035}, tags = {rule-based, operating system, contracts}, researchr = {https://researchr.org/publication/MirzahosseinianP11}, cites = {0}, citedby = {0}, journal = {European Journal of Operational Research}, volume = {214}, number = {2}, pages = {256-261}, }