A study of repairable parts inventory system operating under performance-based contract

H. Mirzahosseinian, R. Piplani. A study of repairable parts inventory system operating under performance-based contract. European Journal of Operational Research, 214(2):256-261, 2011. [doi]

@article{MirzahosseinianP11,
  title = {A study of repairable parts inventory system operating under performance-based contract},
  author = {H. Mirzahosseinian and R. Piplani},
  year = {2011},
  doi = {10.1016/j.ejor.2011.04.035},
  url = {http://dx.doi.org/10.1016/j.ejor.2011.04.035},
  tags = {rule-based, operating system, contracts},
  researchr = {https://researchr.org/publication/MirzahosseinianP11},
  cites = {0},
  citedby = {0},
  journal = {European Journal of Operational Research},
  volume = {214},
  number = {2},
  pages = {256-261},
}