Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date

M. Mousavi, Mostafa Hajiaghaei-Keshteli, Reza Tavakkoli-Moghaddam. Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date. Soft Comput., 24(21):16383-16411, 2020. [doi]

@article{MousaviHT20,
  title = {Two calibrated meta-heuristics to solve an integrated scheduling problem of production and air transportation with the interval due date},
  author = {M. Mousavi and Mostafa Hajiaghaei-Keshteli and Reza Tavakkoli-Moghaddam},
  year = {2020},
  doi = {10.1007/s00500-020-04948-y},
  url = {https://doi.org/10.1007/s00500-020-04948-y},
  researchr = {https://researchr.org/publication/MousaviHT20},
  cites = {0},
  citedby = {0},
  journal = {Soft Comput.},
  volume = {24},
  number = {21},
  pages = {16383-16411},
}