Reducing Wagon Turnaround Times by redesigning the outbound dispatch operations of a steel plant

Atanu Mukherjee, Arindam Som, Arnab Adak. Reducing Wagon Turnaround Times by redesigning the outbound dispatch operations of a steel plant. In Winter Simulations Conference: Simulation Making Decisions in a Complex World, WSC 2013, Washington, DC, USA, December 8-11, 2013. pages 3499-3509, IEEE, 2013. [doi]

@inproceedings{MukherjeeSA13,
  title = {Reducing Wagon Turnaround Times by redesigning the outbound dispatch operations of a steel plant},
  author = {Atanu Mukherjee and Arindam Som and Arnab Adak},
  year = {2013},
  doi = {10.1109/WSC.2013.6721712},
  url = {http://dx.doi.org/10.1109/WSC.2013.6721712},
  researchr = {https://researchr.org/publication/MukherjeeSA13},
  cites = {0},
  citedby = {0},
  pages = {3499-3509},
  booktitle = {Winter Simulations Conference: Simulation Making Decisions in a Complex World, WSC 2013, Washington, DC, USA, December 8-11, 2013},
  publisher = {IEEE},
}