A two-stage hybrid flow shop problem with dedicated machine and release date

Zouhour Nabli, Soulef Khalfallah, Ouajdi Korbaa. A two-stage hybrid flow shop problem with dedicated machine and release date. In Robert J. Howlett, Lakhmi C. Jain, Zoran Popovic, Dejan B. Popovic, Slobodan N. Vukosavic, Carlos Toro 0001, Yulia Hicks, editors, Knowledge-Based and Intelligent Information & Engineering Systems: Proceedings of the 22nd International Conference KES-2018, Belgrade, Serbia, 3-5 September 2018. Volume 126 of Procedia Computer Science, pages 214-223, Elsevier, 2018. [doi]

@inproceedings{NabliKK18,
  title = {A two-stage hybrid flow shop problem with dedicated machine and release date},
  author = {Zouhour Nabli and Soulef Khalfallah and Ouajdi Korbaa},
  year = {2018},
  doi = {10.1016/j.procs.2018.07.235},
  url = {https://doi.org/10.1016/j.procs.2018.07.235},
  researchr = {https://researchr.org/publication/NabliKK18},
  cites = {0},
  citedby = {0},
  pages = {214-223},
  booktitle = {Knowledge-Based and Intelligent Information & Engineering Systems: Proceedings of the 22nd International Conference KES-2018, Belgrade, Serbia, 3-5 September 2018},
  editor = {Robert J. Howlett and Lakhmi C. Jain and Zoran Popovic and Dejan B. Popovic and Slobodan N. Vukosavic and Carlos Toro 0001 and Yulia Hicks},
  volume = {126},
  series = {Procedia Computer Science},
  publisher = {Elsevier},
}