The following publications are possibly variants of this publication:
- A heuristic approach for tow-machine no-wait flowshop scheduling with due dates and class setupsXiuli Wang, T. C. Edwin Cheng. cor, 33:1326-1344, 2006. [doi]
- Single machine batch scheduling problem with family setup times and release dates to minimize makespanJ. J. Yuan, Zhaohui Liu, C. T. Ng, T. C. Edwin Cheng. scheduling, 9(6):499-513, 2006. [doi]
- Competitive two-agent scheduling with release dates and preemption on a single machineShi-sheng Li, Ren-Xia Chen. scheduling, 26(3):227-249, June 2023. [doi]