The following publications are possibly variants of this publication:
- An estimation of distribution algorithm-based hyper-heuristic for the blocking flowshop group scheduling problemSen Zhang, Bin Qian 0001, Rong Hu, Zi-Qi Zhang, Qingxia Shang, Zuocheng Li, Ling Wang 0001. memetic, 17(3):33, September 2025. [doi]
- Probabilistic memetic algorithm for flowshop schedulingBo Liu, Juan-Juan Xu, Bin Qian, Jian-Rong Wang, Yan-Bin Chu. memetic 2013: 60-64 [doi]
- A multiobjective memetic algorithm for integrated process planning and scheduling problem in distributed heterogeneous manufacturing systemsQihao Liu, Xinyu Li 0001, Liang Gao 0001, Guangchen Wang. memetic, 14(2):193-209, 2022. [doi]
- Estimation of distribution evolution memetic algorithm for the unrelated parallel-machine green scheduling problemYue Xue, Zhijian Rui, Xianyu Yu, Xiuzhi Sang, Wenjie Liu. memetic, 11(4):423-437, 2019. [doi]
- A multi-objective two-phase cascaded memetic algorithm for multi-shop integrated scheduling problem with AGV transportationChuang Wang, Quan-ke Pan. memetic, 17(2):29, June 2025. [doi]
- Two-stage memetic algorithm for green flexible job shop scheduling problem considering machine deterioration and maintenanceGuoqiang Zhu, Jianfeng Liu, Wenyin Gong. memetic, 17(2):14, June 2025. [doi]