Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method

Xiangton Qi, Feng-Sheng Tu. Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method. European Journal of Operational Research, 105(3):502-508, 1998. [doi]

@article{QiT98,
  title = {Scheduling a single machine to minimize earliness penalties subject to the SLK due-date determination method},
  author = {Xiangton Qi and Feng-Sheng Tu},
  year = {1998},
  doi = {10.1016/S0377-2217(97)00075-1},
  url = {http://dx.doi.org/10.1016/S0377-2217(97)00075-1},
  researchr = {https://researchr.org/publication/QiT98},
  cites = {0},
  citedby = {0},
  journal = {European Journal of Operational Research},
  volume = {105},
  number = {3},
  pages = {502-508},
}