Ruifeng Shi, Yiming Zhou. A Twin-Screw Coded Evolutionary Algorithm for Multi-level Production Scheduling. In Maozu Guo, Liang Zhao, Lipo Wang, editors, Fourth International Conference on Natural Computation, ICNC 2008, Jinan, Shandong, China, 18-20 October 2008, Volume 1. pages 413-417, IEEE, 2008. [doi]
@inproceedings{ShiZ08-2, title = {A Twin-Screw Coded Evolutionary Algorithm for Multi-level Production Scheduling}, author = {Ruifeng Shi and Yiming Zhou}, year = {2008}, doi = {10.1109/ICNC.2008.463}, url = {https://doi.org/10.1109/ICNC.2008.463}, researchr = {https://researchr.org/publication/ShiZ08-2}, cites = {0}, citedby = {0}, pages = {413-417}, booktitle = {Fourth International Conference on Natural Computation, ICNC 2008, Jinan, Shandong, China, 18-20 October 2008, Volume 1}, editor = {Maozu Guo and Liang Zhao and Lipo Wang}, publisher = {IEEE}, isbn = {978-0-7695-3304-9}, }