On the connection between a cyclic job shop and a reentrant flow shop scheduling problem

George Steiner, Zhihui Xue. On the connection between a cyclic job shop and a reentrant flow shop scheduling problem. J. Scheduling, 9(4):381-387, 2006. [doi]

@article{SteinerX06,
  title = {On the connection between a cyclic job shop and a reentrant flow shop scheduling problem},
  author = {George Steiner and Zhihui Xue},
  year = {2006},
  doi = {10.1007/s10951-006-7041-z},
  url = {http://dx.doi.org/10.1007/s10951-006-7041-z},
  tags = {data-flow},
  researchr = {https://researchr.org/publication/SteinerX06},
  cites = {0},
  citedby = {0},
  journal = {J. Scheduling},
  volume = {9},
  number = {4},
  pages = {381-387},
}