Lot-sizing for a single-stage single-product production system with rework of perishable production defectives

Ruud H. Teunter, Simme Douwe Flapper. Lot-sizing for a single-stage single-product production system with rework of perishable production defectives. OR Spectrum, 25(1):85-96, 2003. [doi]

@article{TeunterF03,
  title = {Lot-sizing for a single-stage single-product production system with rework of perishable production defectives},
  author = {Ruud H. Teunter and Simme Douwe Flapper},
  year = {2003},
  doi = {10.1007/s00291-002-0105-3},
  url = {https://doi.org/10.1007/s00291-002-0105-3},
  researchr = {https://researchr.org/publication/TeunterF03},
  cites = {0},
  citedby = {0},
  journal = {OR Spectrum},
  volume = {25},
  number = {1},
  pages = {85-96},
}