The following publications are possibly variants of this publication:
- Minimizing Total Completion Time Subject to Job Release Dates and Preemption PenaltiesZhaohui Liu, T. C. Edwin Cheng. scheduling, 7(4):313-327, 2004. [doi]
- The complexity of CO-agent scheduling to minimize the total completion time and total number of tardy jobsRubing Chen, Jinjiang Yuan, Yuan Gao. scheduling, 22(5):581-593, 2019. [doi]
- A note on minimizing total weighted completion time with an unexpected machine unavailable intervalPeihai Liu, Chao Wang, Xiwen Lu. scheduling, 22(2):255-262, 2019. [doi]
- Two-agent scheduling on unrelated parallel machines with total completion time and weighted number of tardy jobs criteriaYunqiang Yin, Youhua Chen, Kaida Qin, Dujuan Wang. scheduling, 22(3):315-333, 2019. [doi]
- On scheduling with non-increasing time slot cost to minimize total weighted completion timeYingchao Zhao, Xiangtong Qi, Minming Li. scheduling, 19(6):759-767, 2016. [doi]