Two Sides of a Coin: Optimizing the Schedule of MapReduce Jobs to Minimize Their Makespan and Improve Cluster Performance

Abhishek Verma, Ludmila Cherkasova, Roy H. Campbell. Two Sides of a Coin: Optimizing the Schedule of MapReduce Jobs to Minimize Their Makespan and Improve Cluster Performance. In 20th IEEE International Symposium on Modeling, Analysis and Simulation of Computer and Telecommunication Systems, MASCOTS 2012, Washington, DC, USA, August 7-9, 2012. pages 11-18, IEEE Computer Society, 2012. [doi]

@inproceedings{VermaCC12,
  title = {Two Sides of a Coin: Optimizing the Schedule of MapReduce Jobs to Minimize Their Makespan and Improve Cluster Performance},
  author = {Abhishek Verma and Ludmila Cherkasova and Roy H. Campbell},
  year = {2012},
  doi = {10.1109/MASCOTS.2012.12},
  url = {http://doi.ieeecomputersociety.org/10.1109/MASCOTS.2012.12},
  researchr = {https://researchr.org/publication/VermaCC12},
  cites = {0},
  citedby = {0},
  pages = {11-18},
  booktitle = {20th IEEE International Symposium on Modeling, Analysis and Simulation of Computer and Telecommunication Systems, MASCOTS 2012, Washington, DC, USA, August 7-9, 2012},
  publisher = {IEEE Computer Society},
  isbn = {978-1-4673-2453-3},
}