The following publications are possibly variants of this publication:
- A fuzzy random resource-constrained scheduling model with multiple projects and its application to a working procedure in a large-scale water conservancy and hydropower construction projectJiuping Xu, Zhe Zhang. scheduling, 15(2):253-272, 2012. [doi]
- Research on multi-objective optimal operation model in EPing hydropower stationXiaohui Lei, Haichen Li, Yu Tian, Yunzhong Jiang. bmei 2011: 2232-2235 [doi]
- Researches on the Variations of Greenhouse Gas Exchange Flux at Water Surface Nearby the Small Hydropower Station of Qingshui River, GuizhouLei Han, Xuyin Yuan, Jizhou Li, Yun Zhao, Zhijie Ma, Jing Qin. ifip12 2016: 539-547 [doi]
- A joint order acceptance and scheduling problem with earliness and tardiness penalties considering overtimeXin Li, José A. Ventura, Kevin A. Bunn. scheduling, 24(1):49-68, 2021. [doi]